OEO Ontology

Overview / Open Energy Ontology / Class - methodology
Label: methodology

Definition:
A methodology is a plan specification that describes processes that are part of a study.

Sub classes:
Definition:
An energy balance calculation method is a methodology to calculate an energy balance.

Definition:
Feasible potental determination method is a methodology with the goal of calculating the wind energy potential that remains after applying additional social, regulatory, or market constraints to the available region.

Definition:
A life cycle assessment is a methodology to calculate and analyse environmental impacts of the life cycle of a material entity or process.

Definition:
A primary energy consumption calculation method is a methodology to calculate primary energy consumption.

Definition:
Regionalisation is a methodology to calculate spatially distributed energy producers and consumers with the aim to highlight regional differences in energy supply and potentials, particularly related to renewable energies.

Definition:
Techno-economic potential determination method is a methodology with the goal of assessing the economic viability of wind energy projects within the available area, based on the technical potential and incorporating cost factors and economic metrics.

Definition:
Wind characteristics determination method is a methodology with the goal to understand the specific wind characteristics of a predefined region, encompassing data acquisition, modelling, and analytical procedures. Wind characteristics include speed, direction, frequency, turbulence, and seasonal or diurnal patterns.

Definition:
Wind farm area determination method is a methodology with the goal of identifying and quantifying the area suitable for wind farm development, based on topographical, environmental, and regulatory constraints.

Definition:
Wind potential determination method is a methodology with the goal of calculating the technical wind energy potential within the identified suitable area, considering turbine technology, placement, and energy yield factors.

Back to the super classes:
Definition:
A directive information entity with action specifications and objective specifications as parts, and that may be concretized as a realizable entity that, if realized, is realized in a process in which the bearer tries to achieve the objectives by taking the actions specified.

Editor note:
2009-03-16: provenance: a term a plan was proposed for OBI (OBI_0000344) , edited by the PlanAndPlannedProcess branch. Original definition was " a plan is a specification of a process that is realized by an actor to achieve the objective specified as part of the plan". It has been subsequently moved to IAO where the objective for which the original term was defined was satisfied with the definitionof this, different, term.

Editor note:
2014-03-31: A plan specification can have other parts, such as conditional specifications.

Editor note:
2022-01-16 Updated definition to that proposed by Clint Dowloand, IAO Issue 231.

Editor note:
Alternative previous definition: a plan is a set of instructions that specify how an objective should be achieved